Project Application Report and Preliminary Environmental Assessment
Summary
The Roads and Traffic Authority is proposing to upgrade sections of the Hume Highway south of its intersection with the Sturt Highway.
The Australian Government has allocated $800 million to construct the following Hume Highway projects by the end of 2009:
- Stuart Highway to Tarcutta – six kilometre duplication project from the Sturt Highway intersection to north of Tarcutta.
- Kyeamba Hill – Nine kilometre duplication project between two existing dual carriageway sections south of Tarcutta.
- Little Billabong – Eight kilometre duplication project between Tarcutta and Holbrook.
- Yarra Yarra to Holbrook – Twelve kilometre duplication project from Yarra Yarra to north of Holbrook.
- Woomargama to Table Top – Thirty two kilometre duplication project form south of Woomargama to Table Top (including a major deviation south of Mullengandra).
The Project Application Report and Preliminary Environmental Assessment for these five sections of work was accepted by the Department of Planning in September, 2006.